Feb 18 2018

Linda Beach Redesign Aims to Prevent Flooding

Three Linda-Beach Designs Address Stormwater Drainage

On Thursday, January 18th, the City of Piedmont held its second meeting regarding the Linda Beach Master Plan in the hopes of gaining community input on the matter. The development project, taken on by Recreation Director Sara Lillevand and landscaping firm Groundworks Office, is set to revamp the large area between Howard and Linda Avenues near Beach Elementary School. The meeting was designed to allow Piedmont’s citizens to share their opinions about three existing proposals to assist in the process of creating one final master plan.

    The new concepts were designed based on the expectations of the community and the existing features of the area that give the park its character. The first concept presented was called the “Sports Plan”. Including two regulation size tennis courts and a skate park area, the plan encouraged play for families with children of all ages. The second concept was known as the “Nature plan” which replaced the tennis courts with planted terraces and open event spaces. This concept would create a more traditional park feel with lots of greenery and open space, as well as stadium seating and a picnic deck. The final concept offered was a “Hybrid Plan” which involved what Groundworks viewed as “the best of both worlds”.  The layout would feature one regulation size tennis court as well as an outdoor classroom, greenspace, and bocce courts.

    There were also necessities that the new park will have no matter what. All three plans would include treatment planting to address stormwater drainage as well as a variety of different surfaces with varying levels of porosity to prevent flooding. Picnic tables, event space, and increased access to the area were deemed a must to the project early on and will most likely be included in any final plan. Another element included across the board was interactive art to add color and life to the park as well as support local artists. The city has also requested that the plan provide space for Beach Schoolmates to expand to accommodate its large number of students.

    One of the main concerns expressed throughout all three plans was how to make the best use of the very limited amount of land allocated for the project. City Council member Jen Cavanaugh expressed concern that the storage space beneath the Oakland Avenue bridge would remain empty in all three proposed plans and could be renovated into bathrooms to preserve space.

In my personal opinion, the third plan presented was the most efficient use of land and met more of the communities wishes. I believe it will make the best use of the city’s money and time and, in return, will become a place of great popularity. The city needs a park with a classic park feel that also offers a safe variety of activities for a wide variety of ages. I strongly support the city’s decision to include the community in formulating a plan that is going to create an idyllic new space.

After the meeting concluded Recreation Director Sara Lillevand explained “There are so few opportunities in town to develop available square footage and it is exciting to see what the community wants to do with it”.

The new Linda Beach Playfield is going to be an exciting new place for the city and through this collaborative process it is really going to reflect what we want as a community.

by Ellie Roberts, Piedmont High School Senior

Editors’ Note: Opinions expressed are those of the author.

Leave a Comment