May 19 2014

The following letter was sent to PCA:

As an actively involved member of the community for the past 24 years, I am dismayed at the tactics employed by the opponents of remodeling Piedmont High’s Alan Harvey Theater.

A small band of Measure H opponents has brought public discourse in Piedmont to a new low.

This group’s latest salvo is to misappropriate a quotation by a school board member – who is in fact a strong proponent of the measure – and, taking her words out of context, they have used the attributed quotation on their “No on Measure H” printed materials and website.  This tactic has the effect of suggesting that the school board member in question opposes Measure H, when in fact the opposite is true.  These Measure H opponents have also ignored the school board member’s request that her quotation and name not be used in their material.  Further, the graphic this group is using on their printed materials, website and in an email campaign is crude and offensive.  These folks seem desperate.

Piedmonters, please do not allow yourselves to be manipulated.  Vote FOR Measure H.  Piedmont’s arts are the centerpiece of a public education of which we can all be proud.  That education ensures your property values remain strong.  The aging theater needs to be renovated – both because it is in tatters (the stuffing and springs are popping out of the front row seats!), and because disabled folks cannot reach the seats or use the bathrooms.  If you don’t believe me, check it out yourselves.

But whatever you do, vote YES on Measure H.

Sincerely,

Anne-Marie Lamarche, Piedmont Resident

Editors’ Note:  The opinions expressed are those of the author and not necessarily those of the Piedmont Civic Association.  The Piedmont Civic Association does not support or oppose ballot measures or candidates for public office.  Comments are welcomed below. 

 

May 19 2014

The following opinion was sent to PCA:

Dear Editor:

Measure H is a critically important local measure to repair and renovate our 40 year old Piedmont High School theater.

I am deeply dismayed by the recent advertisements and flyers from certain opponents of Measure H. While people may have differing opinions regarding the measure, deliberate dissemination of false information is unacceptable.

School Board Vice President Andrea Swenson is being quoted in the opponent’s political campaign communications and made to appear an opponent of the measure. She is not. She has asked for her quote and name to be removed from the opposition material.  As of May 15th, this has not been done.

Whenever any one has asked to use my name for any reason, they have asked my permission. Any citizen of Piedmont would expect the same.

As a former elected official and long-standing member of our community, I find it sad that the opposition is playing politics to defeat Measure H. We don’t need mean spirited campaigns in Piedmont.

As a community, we deserve better.

Sincerely,

Sue Smegal, Former School Board Member and Middle School Teacher

Editors’ Note:  The opinions expressed are those of the author and not necessarily those of the Piedmont Civic Association.  The Piedmont Civic Association does not support or oppose ballot measures or candidates for public office.  Comments are welcomed below. 
May 19 2014

Announcement:

         With the Great Drought of 2014 upon us, wise water use has never been more important.  Join Piedmont Connect as we visit beautiful, sustainable gardens that showcase both eye-catching and practical gardening methods.  These stunning and sustainable gardens will delight you with their creative palates, structures and whimsy.

             Garden ramblers in this year’s event will be able to visit 5 or more wonderful examples of sustainable gardening, as well as a local school’s edible garden. The self-guided tour, on Saturday May 31st from 9:00 am to 12 noon, is sponsored by Piedmont Connect, a community group supporting local efforts toward stronger environmental stewardship.
           The Ramble will highlight a variety of approaches to creating gardens that are sensitive to our water and wildlife, focused on California natives and other Mediterranean-climate plants that attract beneficial insects and pollinators. Get inspired by local gardeners who have created dynamic hardscapes using traditional and repurposed ornaments. Expand your garden horizons by seeing what other Piedmonters have done to create enticing kitchen gardens.  The edible garden at Havens Elementary School will also be a stop on the tour, where visitors will see how vegetable gardening can be squeezed into limited space through the use of raised beds and containers.

 

To register for the Green Garden Ramble at www.piedmontconnect.org  by May 25th.  A donation of $10 is requested to cover the costs of showcasing these marvelous gardens.

Piedmont Connect is dedicated to building an environmentally sustainable future by providing a forum for people to share ideas and find ways to collaborate. For further information contact us at piedmontconnect@gmail.com.
May 18 2014

How should Sewer Fund money be used?  

In the 1980’s, Piedmont voters approved a special parcel tax to pay for sanitary sewer rehabilitation of Piedmont’s aging sewer system.  Voters were informed that the tax was needed specifically for updating the sanitary sewer system.  (Sewer Tax amounts can be found on property owner’s Alameda County property tax statement.)

Sewer tax revenues were and are deposited into Piedmont’s Sewer Fund. However, soon after establishing the Sewer Fund, Piedmont needed additional revenues to support City services. Items historically paid for with General Fund monies were reallocated to the Sewer Fund; for example street sweeping, some tree maintenance, staff salary and other ad hoc public works maintenance activities. Records of hours worked by public works employees and projects completed using Sewer Fund money were not kept.

Over the years, more money was taken from the Sewer Fund to pay for ongoing public works maintenance items, rather than primarily being reserved for costs associated with rehabilitation of the sanitary sewer main system, emergency repairs, and maintenance of sanitary sewer mains.

Transferring funds from the Sewer Fund to the General Fund to pay for ongoing City services has allowed General Fund monies to be freed up and available to pay for other items. In recent years these have included employee benefits, utility undergrounding payments ($2.5 million), special capital projects (Blair Park $800,000 and Civic Center Development plans), and increases to the General Fund Reserves.

The FY 2014-15 Budget proposal continues the practice of transfers from the Sewer Fund to the General Fund with a $780,000 allocation.

“The City reviewed the transfer from the Sewer Fund to the General Fund and made some adjustments based on actual costs. First, minor sewer maintenance were being charged to the General Fund for approximately $150,000 and reimbursed through the transfer. The City will begin charging these costs directly to the Sewer Fund in FY 2014-15. Second, after reviewing time spent by the Public Works Department, maintenance and fuel costs for vehicles, and administration costs; the transfer is estimated at $780,000. Staff will continue to refine the estimate as this is the first year using this process.”  Excerpted from the City Administrators report

In 2012, the City proposed a ballot measure consisting of a large increase in the Sewer Fund parcel tax to cover capital improvements to the sanitary sewer mains. At the time, no suggestion was made that the City should or could cease the heavy draw down on the Sewer Fund monies to pay for normal City services.  The increased sewer parcel tax was not approved by voters.  Yet, the City continues to consider the Sewer Fund a source of monies for regular ongoing maintenance items rather than primarily a fund to pay for EPA required sewer rehabilitation.

The recently presented FY 2014-15 Piedmont Budget Proposal states:

The City of Piedmont is in a financially sound and stable position. As was the case in Fiscal Year 2013-14, we are projecting a positive net income for FY 2014-15. This net income is estimated at $699,687 and will bring the projected ending General Fund  [Reserve] balance to $4,232,099, which is 19.1% of total expenditures, inclusive of debt service.

In addition to the above noted measures, the City continues to enjoy a strong and improving economy which is driving a robust real estate market, resulting in Real Property Transfer Taxes (RPTT) projected at $3,000,000 for FY 2013-14.

Overall, the proposed budget ensures no reduction in the range and quality of services which City of Piedmont staff provide to the community. Importantly, it also ensures our ability to continue to set aside funds for the maintenance of our city facilities and equipment replacement needs. Excerpts from the City Administrators report

The City Council’s Budget Advisory and Financial Planning Committee (BAFPC) optionally suggests increased taxation to accelerate sewer rehabilitation. Alternatively, the BAFPC suggested a temporary $1.2 to $1.4 million loan from the General Fund to the Sewer Fund in order to replace the remaining one-third of sewer lines ahead of schedule. (The most problematic lines have been replaced first-175,000 lineal feet of the total $269,000 feet.)  Nevertheless, the Council’s Budget Advisory and Financial Planning Committee (BAFPC) found the Sewer Fund has adequate funds to proceed on schedule to meet the requirements of the Environmental  Protection Agency (EPA) for rehabilitation of the old sanitary sewer mains.  

The BAFPC concluded:

“The net result of our analysis is that the Sewer Fund does not have an operating deficit problem or a long term revenue problem, but a short term capital need for the replacement of the remaining original sewer system.”

To accelerate the scheduled completion of sanitary sewer ahead of the EPA requirement, the BAFPC looks to additional funding or loans. Projecting future construction costs, it is anticipated there would be a cost saving by replacing the remaining older lines not in one early phase, but in three equal phases over the next 12 years.

A significant part of the Public Works Department’s budget comes from the Sewer Fund.  The BAFPC noted the $300,000 emergency repairs budget for the Sewer Fund without indicating if the tasks performed are emergency repairs or potential General Fund expenses.

It is unknown if the Budget Advisory and Financial Planning Committee considered the appropriateness of current drafts made on the Sewer Fund to cover Public Works Department expenses.  

The Council will consider the Sewer Fund at their May 19 meeting.

Read the Budget Advisory and Financial Planning Committees Report to the City Council.

Read the City’s proposed budget for 2014-15.

May 18 2014

Renovation plans significantly reduce audience capacity.

The bird calling contest.  Musicals.  Drama.  A Capella.  Dance.  Band and orchestra. Community theater.  The Alan Harvey Theater is home to all of these, often with sell-out crowds or standing room only.  Which is why I have serious concerns over the proposed renovation of the theater that substantially reduces its capacity and why I believe we need to take an intermission and reconsider what’s being proposed.

Currently the Alan Harvey theater has 500 seats.  Yet the proposed renovated theater would have only 365 seats, a decrease of 27% in the theater’s capacity.  I’ve never attended a performance at the Alan Harvey Theater where 27% of the seats were empty.  There simply won’t be enough room to accommodate parents and friends who want to attend these performances.  And there won’t even be enough room for school assemblies, which, according to the design program, require a minimum of 400 seats.

One of the main reasons being given in support the current plan is that Piedmont High School would focus on becoming a performing arts school, and there’s no arguing that the proposed renovations would create a very attractive venue with ancillary spaces, but it’s not the only solution.  Why are we considering reducing the size of the theater rather than maintaining its current size or enlarging it?  Are we going to be satisfied, after spending at least $14.5 million, that our theater will be 27% smaller than it is now, meaning fewer people will be able to attend those performances?  In addition, because of this, box office revenues would plummet because of fewer ticket sales, decreasing revenues unless ticket prices skyrocket.

We all want to support Piedmont High School’s performing arts students.  So let’s not short-change them and our community by turning away fans and substantially shrinking audiences by building a theater that is way too small.  Think about the effect of removing 135 seats before the upcoming spring drama festival, dance showcase, a capella review, and orchestra and band concerts.  The 135 people turned away won’t be happy, and there will be much less applause in the theater.

Other design solutions exist where at least 500 seats can be maintained.  Let’s get it right and come back from our intermission with a new approach for renovating the Alan Harvey Theater.

Melanie Robertson, AIA, Former Chair of the Piedmont Planning Commission

Editors’ Note:  The opinions expressed are those of the author and not necessarily those of the Piedmont Civic Association.
May 18 2014

Vote-by-mail ballots for the June 3, 2014 election must be posted in time to be received by the Alameda County Registrar of Voters by 8:00 p.m., Tuesday, June 3.   Post marks are not relevant.

 The three cards comprising the ballots are so heavy they require postage of  91 cents.  

 

 

 

May 18 2014
The following letter was sent to the City Council and PCA:
To the Piedmont City Council:
        Move Piedmont’s election date to the November General Election date.  Alternatives presented in the staff report notwithstanding, none outweigh the value of increasing voter turnout in our local election.  The most recent election turnout supports this – an incumbent, two popular candidates and a measure guaranteed to save money and yet voter turnout was only 37%.  All good governance organizations support consolidating elections with the General Election so that turnout is enhanced. As to the concerns of PUSD, there is always access to the June primary ballot, as is currently being done with Measure H.
       I think the concerns about a November election raised by the City Clerk are fairly minor.  Placement on the ballot card and voter fatigue are offset by receiving the ballot through the mail. Indeed, most Piedmonters may have selected this option so that they can have a more informed reading of the ballot at home.  Getting precinct  results less rapidly, while creating more election-night drama, would have no effect on the outcome of an election.
       Finally, analysis of a VBM option should not be based on the statistics from the most recent election (as presented in the staff report) because of the exceptionally low turnout. Turnout statistics from a General Election would be more appropriate for this assessment.
                        Garrett Keating, former City Council Member
Staff report on election date change is on the Monday, May 19, Council Agenda.
Editors’ Note:  The opinions expressed are those of the author and not necessarily those of the Piedmont Civic Association.
May 13 2014

Alan Harvey Theater:  Costs and Alternatives

With approximately two weeks left before the June 3 election on Piedmont ballot Measure H, preferences are heating up.

After the Piedmont Unified School District (PUSD) approved $100,000 of Modernization Funds  for conceptual design and planning of safety and accessibility improvements of the Alan Harvey Theater (AHT), a contract was signed with Quattrocchi Kwok Architects (QKA), the selected finalist. A preliminary construction budget of $5 million was established by PUSD in 2012,  anticipating providing safety and accessibility improvements, the PUSD May 23, 2012 stated goal. The cost of the  improvements escalated to the currently proposed $14.5 million after conceptual drawings led to further improvements and expansion. (The bond issue is for $13.5 million.) Originally the AHT was included in the Seismic Safety Bond, but was removed when engineers assured PUSD that structurally it met “life safety” seismic standards.

The Yes on H campaign has garnered solid support from the school community and performing arts enthusiasts, engendering a comprehensive campaign including signage, phone calls, and glossy literature. The No on H campaign has attracted individuals concerned about the high costs of the “renovation” and the need for further evaluation prior to approving the bond measure.

Yes on H – pro:

  • “All Measure H funds will stay in our community to benefit Piedmont students.”
  • “State modernization funds and private donations will reduce the cost to homeowners.”
  • “An independent Citizens’ Oversight Committee will ensure funds are properly spent.”

No on H – con:

  • Piedmont should not go to the legal limit of  borrowing prior to evaluating District wide needs: all funds from Piedmont school bonds stay in Piedmont.
  • Taxpayers will be responsible for repaying $13.5 million in bond funds plus interest.
  • All bond instruments require compliance with bond issuance specifications.

As with most Bay Area communities, Piedmont property values have risen and exceed their prior economic downturn values.  New buyers of Piedmont homes have well established credit, assets or job security.  The additional amount on their property tax bill to pay for theater renovations will be minor when added to their parcel tax obligation of $10,000 to $20,000 plus per year.  The following information on tax amounts was provided by the School District:

“What impact will Measure H have on my taxes?

……the actual tax rate will not be determined until the bonds are sold. Based on current projections, and a 13-year repayment schedule, the District estimates an increase of $17 per $100,000 of assessed value in the first six years. After existing bonds are paid off in 2020-21, the estimated tax rate would be $50 per $100,000 of assessed value in the remaining seven years.”

Calculations indicate a property valued at $1 million would pay $500 per year in the final 7 years of the bond.

Long time Piedmonters, tax conscious residents, retirees, and others view the additional burden of the bonds as not reasonable or appropriate. Piedmonters currently pay over $2,400 per parcel per year for school operations alone and hundreds more for the interest and principle on existing school bonds used for prior rebuilds and renovations.  Piedmont school parcel taxes are currently the highest in the Bay Area. Opponents of Measure H want the School District’s evaluation of alternatives and priorities to occur before a bond is approved by voters.

Accessibility issues have been a primary driver of the theater renovation because of antiquated restrooms, steps prohibiting wheelchair movements, seating problems, and stage configuration limiting performers.  Those involved with the schools and theater arts have pointed out the desirability of an enhanced theater for both students and the community.

Architects differ on correcting the problems to achieve an appropriate, high-level theater renovation. Some Piedmont architects have found the plans wanting and deserving of revisions prior to approval of the bond measure. While others approve the plans as presented to the School Board.

Vote by or on Tuesday, June 3. Remind your friends and neighbors to vote.

Most Piedmonters will vote by absentee ballot.  Ballots must be received by the Alameda County Registrar of Voters or your local polling place no later than 8 p.m., June 3, 2014. Post marks are not sufficient.  Postage has increased to $.91 to mail your ballot.

Click for more information on where and how to vote.

Read more from advocates on both sides of Measure H:

Theater usage by “Yes on H”

Improvements by “Yes on H”

Understanding accessibility by “Yes on H”

Why No by “No on H”

Renovation cost by “No on H”

Accessibility requirements by “No on H”

Editors’ Note:  The Piedmont Civic Association does not support or oppose ballot measures or candidates for public office.  Comments are welcomed below.  

May 13 2014

Facts show Piedmont is not acting to constrain housing production according to the City’s planning consultant, Barry Miller.

Piedmont’s design review, site improvement requirements, bonding requirements, permit fees, impact fees and permit processing fees, while all potential constraints are not functioning to constrain new housing production in Piedmont. It is not the Charter or City zoning, but the restricted land available, cost of construction, single family housing demand, etc., that limit housing production. The City’s fees are lower than the fees of surrounding communities and the requirements are simpler and more streamlined.

Piedmont’s second units were a focus of the consultant’s presentation: the occupancy levels of legal units; how to identify the illegal units; and preventing displacement of low-income renters in second units. Some of the rent-restricted affordable second units produced during the current 2007-14 period will expire during the upcoming 2015 -2022 period.  Staff will develop ways of encouraging the owners to continue the rent restrictions voluntarily to avoid expelling the low-income renters. Staff suspects there are also unregistered second units and vacant permitted second units. There will be an outreach program to suspected illegal second units to bring them into the program. Piedmont prohibits short-term rental of Air B& B type units, but some are listed online.

Although Piedmont is required to submit an updated Housing Element to the state Department of Housing and Community Development (HCD) by January 31, 2015, compliance is not required to be completed by that date. Piedmont’s current Housing Element was approved three years ago, four years after the beginning of the period.

The Planning Department wants input on the Draft Housing Element.  On June 26, a community meeting is scheduled to be held in the Emergency Operations Center of the Police Department.  Since the meeting is not expected to be broadcast, interested individuals should attend the meeting.

A suggestion was made to send June 26 meeting invitations to second unit property owners and their tenants, requesting attendance at the meeting to describe their experiences with second units.  Notifying second unit neighbors was not suggested. 

By October the consultant hopes to have a review letter from HCD on the working draft of the updated Housing Element, as staff moves ahead to have an approved Housing Element ahead of schedule.

May 13 2014

Piedmont’s Fire Chief Warren (Bud) McLaren has issued a press release.

The Piedmont Fire Department reminds residents that the 2014 Fire Season has been declared and that creating and maintaining Defensible Space is critical for the protection of their homes.

“This year we are preparing for the increased fire risk due to lack of rainfall and resulting drought conditions.” said Fire Chief Bud McLaren.

Piedmont Fire inspectors will be educating residents and evaluating properties to make sure they are in compliance with Piedmont’s city ordnance for fire hazard abatement.

Here are some tips that can help homes survive wildfires:

• Maintain a Defensible Space around all structures.

• Clear all needles and leaves from roofs, eaves and rain gutters.

• Trim branches 6 feet from the ground.

• Landscape with fire resistant and drought tolerant plants.

• Trim branches away from roofs, and 10 feet from the chimney.

• Keep wood piles and flammable materials 30 feet from the home.

• Use fire resistant building materials.

For more information on preparing for Fire Season and Defensible Space contact:

Piedmont Fire Department or visit the Fire Station at:

Piedmont Fire Department

120 Vista Avenue

Piedmont, Ca 94611

510-420-3030

Any day from 8:00 am through 6:00 pm